kids having a great time in the great room
the only time they could run around without be told to go outside!
the only time they could run around without be told to go outside!
Asher removing the carpet strips, which is hard work because they are nailed to concrete
no basements or sub-floor in FL
no basements or sub-floor in FL
Cor putting down the vapor barrier
added protection to prevent moisture from damaging the wood
it has taken him more than 12 hours to spread this sticky heavy paste all over
added protection to prevent moisture from damaging the wood
it has taken him more than 12 hours to spread this sticky heavy paste all over
because the vapor barrier takes 12-16 hours to dry the kids had to camp out in our room for the night. (Why do we need a 4 bedroom home?) Most of the house is blocked off right now. We can get into the master bed/bath through the windows and we can get to the kitchen through the nook window. And I can get to the laundry room through the garage. The kids think this is pretty cool....climbing in and out and walking around the house to get to a different area.
6 comments:
If you send a plane ticket up, I will send down a 22 year old who is good at working.
Payment required: beer.
Asher...that shouldn't be an issue!
Awesome! I can't wait to see it! Christmas time?
Aww, how exciting (even tho I was disappointed not to see y'all this thanksgiving). Can't wait to see the finished product.
p.s. I like Asher's knee pads :)
Hope it is going well!
Looks like a lot of work! It will be worth it though!
Post a Comment