Cor took this week off of work to tear up the carpet and put in hardwood floor. He wasted no time....Friday night we moved all the furniture out of the family room and living room. We set up the TV and couch in the master bedroom, and the rest of the furniture went in the dining room until the floor in the other rooms are finished and then we will do that room.
3 couches, dining room table/buffet and hutch and all the hardwood stacked in this room
kids having a great time in the great room
the only time they could run around without be told to go outside!
every man needs a woman to supervise him!
the kids enjoyed being a part of the work
Asher removing the carpet strips, which is hard work because they are nailed to concrete
no basements or sub-floor in FL
Cor putting down the vapor barrier
added protection to prevent moisture from damaging the wood
it has taken him more than 12 hours to spread this sticky heavy paste all over
because the vapor barrier takes 12-16 hours to dry the kids had to camp out in our room for the night. (Why do we need a 4 bedroom home?) Most of the house is blocked off right now. We can get into the master bed/bath through the windows and we can get to the kitchen through the nook window. And I can get to the laundry room through the garage. The kids think this is pretty cool....climbing in and out and walking around the house to get to a different area.
a breath of peaceful, fresh air
After the vapor barrier is dry, we can start glueing down the hardwood. More pictures to come.